How Much Does an Inground Pool Cost in Venice, FL? (2026)
A typical new pool here is $70,000, with a typical range of $50,000–$98,000 — a planning range, not a quote.
It excludes decking, a screen enclosure, and optional upgrades. A Venice project still depends on your property layout, access, and selected features.
The City of Venice permit portal needs a browser, and Sarasota County's records had no permit values. Some homes with a Venice mailing address are inside the City of North Port; if yours is, see the North Port page.
Where
Where's the pool going?
Enter street, city, and ZIP. ZIP sets the market price.
Jump: calculator · nearby cities · related Q&A · statewide calculator
What a complete quote should include
- Excavation
- Shell and interior finish
- Decking
- Screen enclosure
- Pump and filter equipment
- Electrical work
- Permits and inspections
- Cleanup
Calculator sizes are 12×24 (small lot), 14×28 (smaller yard), 16×32 (our most popular), 18×36 (room for a shelf and laps), and 20×40 (big yard).
Local permit snapshot
Typical declared value from Florida statewide (all permit offices we captured, combined): $70,000 (middle half $50,000–$98,000; sample size 10,317; filed or issued May 11, 2026 through November 11, 2026; checked November 2026). Declared permit values are a floor, not a contract price.
Fee source status: sourced. Last checked: see the series checked label above.
Jurisdiction note: City of Venice issues permits inside city limits. County: Sarasota County.
Permit fees
Formula: 1.3% of an ICC-based valuation plus plan review — City of Venice - Building
Permit 1.3% of valuation, with residential pools valued at 48% of the ICC R-3 VB square-foot value; plan review 0.13% of valuation (Res. 2022-15, Exhibit A).
Source: published fee schedule
This office publishes a formula, itemized fees, or no single dollar amount, so the fee is not added into the calculator total.
Venice permits and your property
Inside city limits, the City of Venice Building Department issues pool permits. It has taken applications only electronically since October 1, 2021 (Permitting). Outside city limits, Sarasota County reviews the pool.
Island and mainland lots
Ask the Building Department to confirm setbacks, easements and flood zone using your current survey. Barrier-island lots may also be near the state Coastal Construction Control Line.
Pool cage / screen enclosure in Venice
A screen enclosure is a separate permit from the pool. Declared values (the value on the permit, not a contract price) for new screen-enclosure permits are in the table above. Ask each bidder to identify enclosure scope separately, and confirm placement with the permitting office and the current survey.
Compare written bids
Compare the same pool size, finish, equipment, deck, enclosure, permits, electrical work, startup, and exclusions. Ask who will submit the permit and what site work is excluded. Before signing, use the Florida DBPR Verify a License lookup to check the contractor’s current record and confirm the business name matches the contract.
How the pool permit process usually starts in Venice
- Apply in the City's eTRAKiT system; paper isn't accepted (Permitting).
- Use the Pool, Spa & Deck Checklist and the Residential Swimming Pool Safety Act Form (Applications/Permits/Forms).
- Your pool contractor must hold a City contractor registration (Contractor Registration).
- Verify a license.
Venice pool planning: local facts
- Look up your parcel's flood zone on FEMA's Flood Map Service Center before you plan the pool and deck.
- FPL lists Venice, Venice Gardens and South Venice as separate Sarasota County communities it serves (FPL tariff). Your parcel, not the mailing address, decides city or county permitting.
- Venice's own utility runs a reverse-osmosis water treatment plant supplied by a wellfield (Water Treatment Plant Supply Well 10E).
Nearby pool cost guides
Full index: pool costs by city.
FAQ
- Who issues permits for a Venice pool?
- Inside city limits, the City of Venice Building Department issues pool permits. It has taken applications only electronically since October 1, 2021 (Permitting). Outside city limits, Sarasota County reviews the pool.
- Does the pool range include a screen enclosure?
- Where the records describe the work, permits that list a screen enclosure are left out of the pool figure. The screen enclosure is priced on its own line.
- Does my pool contractor need to register with the City?
- Yes. Venice requires residential pool contractors to get a City contractor registration before working in the city (Contractor Registration).
- Is the calculator a quote?
- No. No usable local permit data was available for Venice, so it is the Florida-wide median declared value (the value on the permit, not a contract price) of the permits we captured, a floor and not a quote. The firm price is in writing after a builder's free visit.