How Much Does an Inground Pool Cost in Englewood, FL? (2026)
A typical new pool here is $57,200, with a typical range of $45,000–$69,900 — a planning range, not a quote.
It excludes decking, a screen enclosure, and optional upgrades. A Englewood project still depends on your property layout, access, and selected features.
Englewood is split between Charlotte County and Sarasota County. This is the unincorporated Charlotte County figure; Sarasota County's records had no permit values we could use, so the Sarasota County part has no figure of its own.
Where
Where's the pool going?
Enter street, city, and ZIP. ZIP sets the market price.
Jump: calculator · nearby cities · related Q&A · statewide calculator
What a complete quote should include
- Excavation
- Shell and interior finish
- Decking
- Screen enclosure
- Pump and filter equipment
- Electrical work
- Permits and inspections
- Cleanup
Calculator sizes are 12×24 (small lot), 14×28 (smaller yard), 16×32 (our most popular), 18×36 (room for a shelf and laps), and 20×40 (big yard).
Local permit snapshot
Typical declared value from Charlotte County (unincorporated): $57,200 (middle half $45,000–$69,900; sample size 596; filed May 11, 2026 through November 11, 2026; checked November 2026). Declared permit values are a floor, not a contract price.
Fee source status: sourced. Last checked: see the series checked label above.
Jurisdiction note: Charlotte County or Sarasota County, depending on the parcel. County: Charlotte County.
Englewood pool permit data, May–November 2026
Charlotte County (unincorporated)
For Charlotte County parcels
Charlotte County (unincorporated) permit records show at least 636 new residential in-ground pool permits filed from May 11 to November 11, 2026 (Charlotte County permit records, checked November 2026).
38% of these permits (239 of 636) name a spa in the permit description.
Screen-enclosure permits ran about 1.2 per new pool permit over the same period (771 enclosure permits). That's a ratio, not a price; some are re-screens, replacements or cages over existing pools.
Partial source: our pull of this office's records may be incomplete, so treat the count as a minimum.
Sarasota County (unincorporated)
For Sarasota County parcels
Sarasota County (unincorporated) permit records show at least 648 new residential in-ground pool permits filed from May 11 to November 11, 2026 (Sarasota County permit records, checked November 2026).
Partial source: exported from the county's permit portal; completeness wasn't independently verified, so treat the count as a minimum.
Permit fees
$200 in-ground flat fee at application, plus issuance fees and a valuation formula — Charlotte County Community Development - Building
Charlotte County part of Englewood shown. The Sarasota County part uses the Sarasota County fee shown below.
- Building flat fee at application (in-ground): $200
- Surcharge: 2.5% of building fee
- Zoning review at issuance: $22
- Right-of-way review at issuance: $90
- Building fee at issuance: 0.004 x ICC valuation, if valuation is $50,000 or more
Source: published fee schedule
This office publishes a formula, itemized fees, or no single dollar amount, so the fee is not added into the calculator total.
Englewood permits and your property
Englewood-area parcels can be in Charlotte County or Sarasota County. FPL lists Englewood under Sarasota County and Rotonda under Charlotte County (FPL tariff). Check which county your parcel is in first. For Charlotte County parcels, start with its Residential Pool or Spa page. For Sarasota County parcels, start with the Sarasota County permit search.
Coastal A and V zones
Charlotte County explains that V zones are areas hit by waves over 3 feet, where construction must include pilings and piers. In Coastal A zones, waves of 1.5 to 3 feet can occur, and construction is regulated to V-zone standards (Flood Information). On Charlotte-side lots in those zones, the County requires signed and sealed pool engineering (pool page).
Pool cage / screen enclosure in Englewood
A screen enclosure is a separate permit from the pool. Declared values (the value on the permit, not a contract price) for new screen-enclosure permits are in the table above. Ask each bidder to identify enclosure scope separately, and confirm placement with the permitting office and the current survey.
Compare written bids
Compare the same pool size, finish, equipment, deck, enclosure, permits, electrical work, startup, and exclusions. Ask who will submit the permit and what site work is excluded. Before signing, use the Florida DBPR Verify a License lookup to check the contractor’s current record and confirm the business name matches the contract.
How the pool permit process usually starts in Englewood
- Confirm which county your parcel is in.
- Charlotte side: submit the Residential Pool/Spa application, Affidavit for Accessory Structures, plans and site plan, plus a Tree Permit Application if you're clearing (pool page).
- Sarasota side: apply and track through Sarasota County's permit site.
- Verify a license.
Englewood pool planning: local facts
- FPL's tariff lists Englewood under Sarasota County, and Rotonda, Placida and Manasota Key under Charlotte County (FPL tariff).
- Charlotte County measures elevations in the NAVD88 vertical datum for floodplain and construction rules (Flood Information), so make sure your survey uses the same datum.
- Charlotte County's pool page says a recorded Notice of Commencement is due before the first inspection when the contract is over $5,000.
Nearby pool cost guides
Full index: pool costs by city.
FAQ
- Who issues permits for a Englewood pool?
- Englewood-area parcels can be in Charlotte County or Sarasota County. FPL lists Englewood under Sarasota County and Rotonda under Charlotte County (FPL tariff). Check which county your parcel is in first. For Charlotte County parcels, start with its Residential Pool or Spa page. For Sarasota County parcels, start with the Sarasota County permit search.
- Does the pool range include a screen enclosure?
- No. These pool permits don't list a screen enclosure. The screen enclosure is priced on its own line.
- Which county reviews my Englewood pool?
- It depends on the parcel. Charlotte County reviews the Charlotte side, including Rotonda West, and Sarasota County reviews the Sarasota side.
- Is the calculator a quote?
- No. It is the typical declared value (the value on the permit, not a contract price) on Charlotte County (unincorporated) permit records, which this page uses for Englewood, a floor and not a quote. The firm price is in writing after a builder's free visit.